AIRELA · Built for electronics manufacturing

Spot it.
Before it
costs you.

Your AI assistant. Your design checks.
Your coating process planning. One shared project.

From the first question
to a coating plan you can work with.

AIRELADfM ManagerCoatmaster
Scroll to see how it works.

From first finding to next step

Three specialists.
One connected workflow.

A production issue can start in the layout. The layout shapes the way you apply the coating. AIRELA connects those decisions so each step builds on what you already know.

Understand

AIRELA

Show a photo, ask a technical question and bring practical experience and sources into the discussion.

Expertise on the go

Check

DfM Manager

Assess manufacturing and coating risks in the design. See the location, the measurement and what to check next.

From layout to finding

Plan

Coatmaster

Review application paths, keep-out zones and predicted coating spread together. Compare changes before trying them.

Follow the coating flow
Keep the project in view.

Questions, findings, revisions and decisions stay connected.

Coatmaster · The millimetres that matter

You plan the application.
Where does the coating go?

The coated area can look fine. Near a connector, a narrow gap can change everything. See why coating flow belongs in the plan.

Coatmaster · Process visualisation

Coating on the PCB. The coating spreads towards the connector. It can wet the contacts. Red marks the keep-out zone. Blue shows where coating is planned.

Illustrative visualisation. Predictions depend on material, geometry and process inputs. Physical trials remain part of process validation.

Spot risks sooner. Review sensitive areas in the context of the application path.

Focus your changes. Compare process inputs and planning options.

Reduce scrap risk. Work through issues before ramp-up.

DfM Manager · From layout to production

A good design is one
you can build.

PCB fabrication, assembly and conformal coating each have their own requirements. Check the applicable design rules and discuss findings in the project.

Design for conformal coating

Clearance shapes
the process.

One connector. Two nearby components. One possible flow path. The DfM finding turns it into a concrete layout decision.

Example: current clearance
0.4 mm
Proposed in this example
1.0 mm

Illustrative redesign. Required clearance depends on the material, process and component geometry.

Original layout · 0.4 mm component clearance. Coating can reach the connector. Revised layout · 1.0 mm component clearance. In this example, coating stays outside the keep-out zone.

Design for PCB fabrication

Compare trace widths, drill sizes, via designs and nominal annular rings with the selected fabrication profile.

Plan for assembly

Flag overlapping courtyards, missing checkable geometry and duplicate reference designators.

Design for coating

Review keep-out zones, connectors, capillary gaps and access alongside the planned application.

Check coverage depends on the file format, the data available and the selected profile. The report shows which checks ran.

Look beneath the surface

A closer look at a PCB failure mechanism

Looks fine outside.
The risk is inside.

CAF is the growth of a conductive anodic filament within the laminate. Moisture, electrical bias, materials and manufacturing quality all play a role.

The animation explains the mechanism. CAF verification and design qualification require separate evidence.

The surface of the PCB looks intact. The cross-section reveals the plated hole and inner layers. Damage at the glass–resin interface opens a path. Moisture and DC bias allow a conductive path to grow. Insulation resistance can drop. An example redesign with more clearance.

AIRELA · When a question comes up

20 years of experience.
Always with you.

At your bench, on the line or with a customer. AIRELA brings practical experience, technical documents and targeted research to the case in front of you.

Photos & project contextMaterials & processSources & experience
Example conversation
You

Coating is creeping under the connector. What should I check first?

AIRELA

Let’s check the clearance, the material and how much you’re applying. Show me the area and the planned application path.

Coatmaster · Worked example

How much time goes
into rework?

From setup to production release. Use your own figures to compare staff time and the time your line is tied up.

Staff time per job
EU manufacturing labour costs in 2025
Time the line is tied up per job

Your scenario

Current process8 hr
With Coatmaster2 hr
Estimated cost difference per month €14,040

€1,170 per job

Staff72 hr€5,400
Machine72 hr€8,640

Technical knowledge with context

A better answer
starts with your case.

Grounded in practice.

20 years of experience from Gianfranco Sinistra in electronics manufacturing, materials and coating processes.

Sources you can check.

Technical documents, material data and targeted research help explain the reasoning behind a recommendation.

Connected to your project.

The selected finding, the revision and your earlier questions stay in the conversation.

Start with your next board.

Bring your own case.
We’ll show you AIRELA.

See how the knowledge assistant, DfM Manager and Coatmaster can work together in your process.

About this product preview

What the films show.
How to read them.

The films use illustrative scenes, some AI-generated. Feature availability and data requirements vary by module and development stage. We can confirm the scope in your demo.

Coatmaster uses simplified models and process assumptions. Validated 3D CFD and production approval require separate evidence. Physical trials remain necessary.

90–95% is a target assumption for selected research, review and planning tasks. The calculator uses the figures you enter.

The conversation shown is an example. Contact links open your email app. The page uses no analytics trackers, external fonts or marketing cookies.

This is a product preview. Provider details, privacy information and pilot terms will be completed before the regular launch.

contact@airela-tech.com